Machining Solutions Brass coupling
Machining Solutions 2
Brass Coupling

Problem:

    Drill & tap #2 holes 1/8” NPT @ `A'
    Drill Ø2mm @ `B', `C' & `D'
Previous cycle time, 2.33 minutes each across 3 fixtures and 4 drilling machines
Total per 7 hour effective shift = 180 articles


Component
 Solution:

     HAAS VF0E with an HRT210 rotary table
     #1 dedicated 90 degree angle tombstone
     #1 Brew-Eng ARTB 210 braked `A' frame
Quantity per cycle: 22 articles @ 11 per face.
Cycle time: 15.8 minutes, load/unload time 3.5 minutes.  19.3 minutes/22 articles = 0.87 minutes each.
Total per 7 hour effective shift = 478 articles.

HAAS Machining Pocket view

AutoCAD Drawing
Side elevation with clamps removed.


The cycle time for the HAAS machining is on standard tooling, after installation carbide tooling was purchased and is now in use reducing the cycle time dramatically.